This has enabled us to increase supplies of the most demanded fractions and to adapt to the increasing market requirements for certain products.
The production line premises replaced the former cement production infrastructure. In its place, a new modern production hall has been built equipped with the state-of-the-art technology with a direct link between production and product distribution. It includes a dispatch line with dispatch capability for both road and rail transport. The production facility was built with the possibility of further extension of the production facilities and thus further increase of production capacities in the future. We are ready to further double the production capacity in the coming years.
Inspiring video showing the effects of the ZeoFeed® product on the digestive tract of animals.