In order to adapt to this trend, we have increased the capacity of the transport infrastructure. We have renovated the track for freight trains so that it is ready for increased volumes of transported materials and production. We deepened and compacted the gravel beds and the geometric position of the track was repaired. Reconstruction of the railway line will allow us to import a higher volume of input raw materials and ship finished products, thereby reducing CO2 production in the process of production zeolite and building materials.
Video inspirador sobre los efectos del producto ZeoFeed® en el tracto digestivo de los animales.
Una vista del interior de la fábrica donde se extraen, procesan y empaquetan la zeolita y los productos de zeolita.